Every electrician with experience of working on a busy site knows how it feels to take responsibility for the other tradesmen around them.When you are dealing with live electricity there’s no room for calculated risks and educated guesses. The only way you can ensure the safety of you and your colleagues is through adopting adequate safe isolation procedures.For electrical systems where the supply has been cut off to allow dead working, Regulation 13 of the Electricity at work Regulations 1989 applies as follows:“Adequate precautions shall be taken to prevent electrical equipment, which has been made dead in order to prevent danger while work is carried out on or near that equipment, from becoming electrically charged during that work if danger may thereby arise.“

This establishes a clear requirement to ensure that conductors and equipment may not be inadvertently energised. In other words, safe isolation.In practise this means not only cutting off the supply, but also ensuring the method of disconnection is secured in the OFF position and a caution notice or label is posted at the point of disconnection.

Safe Isolation procedures

Isolation of equipment or circuits using the main switch or distribution board switch disconnector is the preferred method. The method of isolation should be locked off using a unique key, retained by the person carrying out the work, and a caution notice posted at the point of isolation.Where more than one operative is working on a circuit, a multi-lock hasp can be used to prevent operation of the main isolator until such time as all persons working on the installation have completed their work and removed their padlocks from the hasp.

"The practice of placing insulating tape over a circuit breaker is not an adequate or acceptable means of securing the device in the OFF position."

Proving dead isolated equipment or circuits

Following isolation of equipment or circuits and before starting work it should be proved that areas you are about to work on are in fact dead. There commended method for doing is by use of a test lamp or a two pole tester (as recommended in HSE Guidance Note 38). The test lamp or voltage detector should be proved to be working on a known live source or a proprietary proving unit. All line, neutral, and protective conductors should be tested to prove they are dead.Electricians who regularly work on installations that have been energised should be equipped with devices for proving that conductors are dead. Di-log latest range of safety equipment for working on LV Electrical Equipment includes an array of Lockout Kits,ranging from a simple single MCB Personal Lockout Kit’ for isolation of individual circuits through to the industrial ‘Expert Lockout Kit’with mostly fully insulated lockout devices for virtually all individual and main sources of energisation.The Di-log range of ‘Lockout Kits’ are designed with safety, versatility and affordability in mind. With the entry level DLLOC1 -Personal Lockout Kit, you get a 38 mm steel padlock, a universal MCB lock, a standard ‘Pins-out’ MCB Lock and Warning Tag.The higher the level of kit the more features are included. By adding items such as multiple isolation lockout hasps,the kits enable multiple persons to work on the same circuit, with the ability to holdup to six lockout padlocks.The DLLOC3 – Professional and DLLOC4 – Expert kits provide more scope to safely isolate a broader range of MCB’s and Main switches. Items such as the larger universal MCB lock out device, large main switch lock out device, and with a fully insulated padlock and hasp, ensure all commercial and industrial applications are covered.

ISOPK1 and ISOPK2 To fully conform to the ‘Safe Isolation Procedure’, and in addition to the above,once the circuit or main source of energy has been isolated, the conductors must be proved to be dead at the point of work before they are touched and, where necessary, caution notices should also be applied at the point(s) of isolation. With this in mind, Di-log has combined its Lockout Kits with its award winning 2-Pole Combivolt Voltage Indicators and its PU260 – 690V2-Pole Voltage Proving Unit to create the all new ISOPK1 – CombiVolt 1 Safe Isolation Kit c/w DLLOC1 and ISOPK2 –CombiVolt 2 Safe Isolation Kit c/w DLLOC2 The CombiVolt Voltage and Continuity Indicators are packed with features, such as single pole voltage indication (even when the batteries are depleted), phase rotation and non-trip phase to PE indication. The also fully conform to all standards, including the vital BS EN61243-3-2015. The PU260 – 690V Proving features LED indication if your 2-pole tester draws excessive current above 3.5mA, thus not conforming to standards such a ‘Protection against Electric Shock’.With all the above combined together, Di-log can confidently boast that they offer one of the most comprehensive Safe Isolation Kits available to the UK market.

Unit 28 Wheel Forge Way
Trafford Park
M17 1EH
Manchester, Lancashire
United Kingdom

Safety & Health Expo 2023

The last Safety & Health Expo in-person event took place on 16 - 18 May 2023 at ExCeL London.

Exhibitor List Sponsor

Exhibitor List Sponsor Logo

Come see us at stand SH1810

DL9118 - Advanced 18th Edition Multifunction Tester
Product

DL9118 - Advanced 18th Edition Multifunction Tester

The DL9118 multifunction tester has been designed to fully comply with the testing requirements of the up and coming 18th Edition wiring regulations. It also incorporates many of the features that we have come to expect with modern MFTs. It is designed to be worn around the neck with a comfortable harness, fo...

View product page

Lockout & Safe Isolation Kits
Product

Lockout & Safe Isolation Kits

Di Log Test Equipment is delighted to offer to you the ISOPK1 & ISOPK2 Kits incorporating the award winning CombiVolt™ 2 pole voltage testers, the fully conformant PU260 and our all new Locko kits.   

The PU260 is the first, 2 pole 690V voltage tester pro...

View product page

List your business for free

Create a business listing on the SHP directory

Advertise with us

Download our media pack, and find out how we can meet your needs with a range of pricing options.

Close
CONTACT DI-LOG TEST EQUIPMENT
* Oops!
* Oops!
* Oops!
* Oops!
* Oops!
I have read, understood and consent to your Privacy Policy
* sorry this is a required field
MESSAGE SENT!

Thanks for using SHP Directory,

Your enquiry has been sent to the selected companies, they will be in contact shortly.